Information on the work for LCWIP taking place in Evesham.

A public engagement exercise about the draft Evesham Local Cycling and Walking Infrastructure Plan (LCWIP) was carried out from Monday 5 August to Friday 27 September 2024. The draft Evesham LCWIP was developed by Aecom on behalf of 91制片厂County Council. It includes three shortlisted cycling routes and a town centre walking zone. An earlier survey took place in 2021 about proposals to improve sustainable transport measures across the town. 

The final Evesham LCWIP and Public Engagement Report 2024 report are available here:

Your response

The engagement exercise engaged with a wide range of people, reflecting the views of residents and organisations in and around Evesham. 

A total of 262 people responded to the online survey and analysis of responses shows that:

  • there was a high level of agreement with the aims and objectives
  • the majority of respondents agreed with the three shortlisted active travel routes to encourage more walking and cycling
  • the majority of respondents stated that they would walk and/or cycle more should the routes be delivered as outlined in the plans

Your feedback has helped to inform the final Evesham LCWIP which sets out the prioritised list of schemes for delivery over a 10-year period to improve the safety, comfort, and attractiveness of walking, cycling and wheeling. 

Next steps

The development of LCWIPs does not guarantee funding but allows 91制片厂to make the case for funding of future cycling, walking and wheeling schemes. The Evesham LCWIP is a key document to inform future funding bids.